Descargar Imprimir esta página

Fulgor Milano FHH 600 ID TC BK Instrucciones Para La Instalación Y El Uso página 42

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 124
EN
Fig. 17 - 60cm worktop.
Fig. 18 - 80cm worktop.
10
(5 air intakes)
(7 air intakes)
• If a drawer is placed under the hob, maintain a clearance of
at least 30 mm between the ventilation of the underside of the
hob and what is stored inside the drawer to ensure good air
circulation and cooling of the appliance.
• If a drawer is placed under the hob, avoid placing flammable
objects (e.g. sprays) or non-heat-resistant objects in this drawer.
• The connection cable must not be subjected to any mechanical
stress after installation, e.g. from a drawer.
CAUTION
Only use the hob guards designed by the manufacturer of the
cooking appliance or indicated by the appliance manufacturer
in the operating instructions as suitable or hob guards built into
in the appliance. The use of inappropriate guards can lead to
accidents.
3.3.B CONSTRUCTION INSTRUCTIONS - DISCHARGE
ON BASEBOARDS
To allow correct housing of the discharge pipe, if it is fitted under
the cabinet baseboard. The base must be discharged as shown in
Fig. 19 and the back panel removed if necessary.
Introduction of this extraction system results in a maximum possible
length for any drawers provided under the hob of approximately
450 mm.
The depth of the drawers is indicative and based on a cabinet base
with standard dimensions.
Fig. 19

Publicidad

loading

Este manual también es adecuado para:

Fhh 800 id tc bk