Scheduled Routine Maintenance - Orved evox 25 Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

8.2 SChEDULED ROUTINE MAINTENANCE

FREqUENCY
before each start-up
Weekly
Every 5000 work cycles
Every other oil change
Every 6 months and after ha-
ving been idle for a long time
yearly
Rev. 02 - 05/2016 - Cod. 1500015 - Instruction manual for vacuum chamber packaging machines EVOX 25 / EVOX 25 H
MAChINE PART
Pump
Power cable
Lid
Silicone counterpart bar and
lid gasket
Machine and Vacuum chamber
Sealing bar connection
Sealing bar
Pump
Machine, vacuum chamber, lid and
panels
Pump
Pump.
Pump.
Lid hinges
REGULAR MAINTENANCE
INTERVENTION
Check the level and colour of the oil; top-up or
replace, if the colour is too dark or whitish.
Verify its integrity; replace if defective (contact
a specialised after-sales centre).
Verify its integrity; if there are any cracks or
streaks, contact the after-sales centre to replace
the lid.
Replace if defective or worn.
Clean impurities, oil and grease.
Check that it is inserted well on to the two
contact pins.
Clean the upper part with a damp cloth.
Clean the two contact pins.
Run the pump oil dehumidification cycle.
Disinfect
Replace the pump oil
(contact a specialised after-sales centre).
Replace the pump purifier filter (contact a spe-
cialised after-sales centre).
Replace the pump oil (contact a specialised
after-sales centre).
Lubricate the pins with suitable grease that
is certified for food use (contact a specialised
after-sales centre).
35

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Evox 25 h

Tabla de contenido