Made
in
Germany
The maximum height
from the upper edge
of the base plate to
the upper edge of
the lift rails must not
exceed 695 mm.
If improper settings are done on
the potentiometer, this can lead to
malfunctioning of the lift and even
to danger for life and limb and
permanent damage to the lift and
the vehicle on it.
• Remove the operating unit on the operating column.
• If potentiometer 3 (for "Up Off") is turned anti-clock-
wise, the upper holding point is moved upwards and
the lift stops later in the lifting process.
• If the potentiometer 3 (for "Up Off" is turned clockwise,
the upper holding point is moved downwards and the
lift stops earlier in the lifting process.
• If potentiometer 4 (for "Down Off") is turned anti-clock-
wise, the lower holding point is moved upwards and
the lift stops earlier in the lowering process.
• If the potentiometer 4 (for "Down Off") is turned clock-
wise, the lower holding point is moved downwards and
the lift stops later in the lowering process.
i
In the following alignment work it must be absolutely
ensured that a block movement of the lift is prevented.
The potentiometer for the "Up or Down Off" may only
be fine-adjusted, meaning the potentiometer is slightly
adjusted, then the lift is actuated. Repeat the proce-
dure until the desired end point of the lifting rails is
reached.
114
7
Maintenance and care of the lift
Before maintenance, do all prepa-
ration work so there is no danger
to life or limb or object damage
during maintenance and repair
work.
Legal principles: BSV (operating
equipment regulation) + BGR500
(Operation of work equipment)
Value is placed on long lifetimes and safety in the devel-
opment and production of Nussbaum products. To guar-
antee the safety of the operator, product reliability, low
running costs, keep the warranty and also the long-life-
time of the product, proper set up and operation is just
as important as regular maintenance and sufficient care.
Our platforms fulfil or exceed all safety standards of the
countries we supply to. For example, European regu-
lations require a service by qualified experts every 12
months of work of the platform. To guarantee the larg-
est possible availability and functional capacity of the lift
system, ensure the list of any cleaning, care and mainte-
nance work is done.
After first commissioning the lift is to be serviced at regu-
lar intervals of a maximum of one year by an authorized
person according to the following plan. For intensive op-
eration and higher degree of contamination shorten the
service interval.
The complete function of the lift is to be observed during
daily use. Customer service must be informed of any mal-
functions.
Lubrication and maintenance sticker on the lift
column
1
2,C
2
3,A
3
3,D
3,D
4
3,C
5,A
6,A
5
1,A
6,C
5,C
6
Descriptions: e.g.
1B = Lubricate with a multi-purpose grease semi-annually.
5C = Clean monthly with compressed air
1
2,C
2
3,A
3
3,D
3,D
4
3,C
5,A
6,A
5
1,A
6,C
5,C
6
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL_V4.4_DE-EN-FR-ES-IT
A
12 1
3,A
1,A
11
4,A
10
1x/12
9
8
7
6
B
12 1
11
6,C
10
4,A
2,B
2x/12
9
4,C
8
7
6
C
12 1
11
10
12x/12
9
6,C
3,D
5,C
8
5,B
7
6
D
12 1
1,A
2,B
11
3,A
10
365x/12
9
8
4,A
7
6
A
12 1
3,A
1,A
11
4,A
10
1x/12
9
8
7
6
B
12 1
11
6,C
10
4,A
2,B
2x/12
9
4,C
8
7
6
C
12 1
11
10
12x/12
9
6,C
3,D
5,C
8
5,B
7
6
D
12 1
1,A
2,B
11
3,A
10
365x/12
9
8
4,A
7
6
2
3
4
5
1
2
2
3
4
5
3
2
4
3
4
5
5
2
3
4
6
5
2
3
4
5
1
2
2
3
4
5
3
2
4
3
4
5
5
2
3
4
6
5