Descargar Imprimir esta página

Nussbaum SMART LIFT 2.30 SL Manual Del Usuario página 124

Ocultar thumbs Ver también para SMART LIFT 2.30 SL:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Made
in
Germany
• When merging the cable connections at the head plate,
ensure that the cable does not contact rotating parts.
The 7-wire motor plug cable (with 2 plugs) is plugged
into the head plate on the operating side, via the riser
and cross-pipe and fed to the opposite side and con-
nected to the head plate of the opposite side.
The 3-wire potentiometer cable (with 2 plugs) is also
fed via the riser and cross-pipe to the opposite side and
connected with the plug to the head plate of the oppo-
site side.
The 5-wire power cable (with one plug) connects the
power supply to the head plate of the operator side.
• Carefully push the cover panel into the riser pipe from
above.
Figure 23: Cable path when using risers and cross-pipes
B) without using risers and cross-pipes (sub-
floor)
• There is the option of running power and electrical ca-
bles below the floor. This prevents the need for risers
and cross-pipes (cable bridges) between both columns.
A foundation must be made according to plan 6348_
EINBAU (integration) (chapter 3.4).
• The opening for the cables are each found in the base-
plate
• The cables are laid in the shafts located in the columns.
• During assembly of the lift, it must be ensured that the
cables are not damaged during column set up.
• Feed the cable through the empty pipes in the foundation
before the columns are set up. Then move the columns
to the installation location. Place the cables through the
holes in the baseplate and guide them through the col-
umn to the column head. Carefully place the columns
upright to prevent kinking or clamping.
• Connect the cables according to the drawing (Figure
24).
124
• When merging the cable connections at the head plate,
ensure that the cable does not contact rotating parts.
• Pay particular attention to secure contact of the plug
connections.
Figure 24: Cable path without using riser and cross-pipe
8.3 Support arm assembly
8.3.1 Mounting and greasing the support
arms
The procedure for mounting the support arms is as fol-
lows:
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL_V4.4_DE-EN-FR-ES-IT
Grease the support
arm support with an
acid-free multi-pur-
pose grease.
Position support arm

Publicidad

loading

Este manual también es adecuado para:

Smart lift 2.35 slSmart lift 2.40 sl