POWR
CYLINDER HEAD
EXPLODED DIAGRAM
20 N • m (2.0 kgf • m, 14 ft • Ib)
1st
2nd 49 N • m (4.9 kgf • m, 35 ft • Ib)
20 N • m (2.0 kgf • m, 14 ft • Ib)
1st
2nd 64 N • m (6.4 kgf • m, 46 ft • Ib)
40 N • m (4.0 kgf • m, 29 ft • Ib)
8 × 20 mm
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
CYLINDER HEAD REMOVAL
Engine unit
Air filter case
Exhaust pipe 3
Exhaust pipes 1 and 2
Oil tank
Intake and exhaust camshaft
1
Bolt
2
Hunger
3
Bolt
CYLINDER HEAD
E
5
E
4
E
2
6
1
7
LT
271
10 N • m (1.0 kgf • m, 7.2 ft • Ib)
6 × 12 mm
10 N • m (1.0 kgf • m, 7.2 ft • Ib)
6 × 55 mm
3
5
5
E
5
Q'ty
Follow the left "Step" for removal.
Refer to "ENGINE UNIT".
Refer to "FUEL INJECTION SYSTEM" in
Chapter 4.
Refer to "EXHAUST PIPE 3".
Refer to "EXHAUST PIPES 1 AND 2".
Refer to "OIL TANK".
Refer to "CAMSHAFTS".
2
1
3
5-60
5
E
E
10 N • m (1.0 kgf • m, 7.2 ft • Ib)
6 × 12 mm
8
Service points
E