Hella Gutmann
3. Select >BPC<.
4. Push
to Search for BPC-Tool.
5. Observe the information window.
6. Confirm the info window with
ð The connection to the BPC-Tool is established.
ð Once the connection between the mega macs PC SE software and the BPC-Tool has been set up successfully, a
drop-down list of the BPC-Tools that have been found is displayed.
7. Select the required BPC-Tool.
ð The selection will be saved automatically.
ð The selected BPC-Tool address is displayed in the field BPC address.
10.3.1.2. Deactivating the BPC-Tool Connection and Deleting the Assignment
Here you can deactivate the BPC-Tool connection and delete the assignment.
Proceed as follows to deactivate the BPC-Tool connection and delete the assignment:
1. Select Settings > Interfaces.
2. Select >BPC<.
3. Push
to Deactivate connection to BPC-Tool and delete allocation.
4. Observe the confirmation prompt.
5. Confirm the confirmation prompt with
ð The BPC-Tool connection is deactivated and the assignment is deleted.
10.3.1.3. Starting a BPC-Tool Update
Proceed as follows to start the BPC Tool update:
1. Connect the BPC-Tool to the battery.
2. Select Settings > Interfaces.
3. Select >BPC<.
NOTICE
Insufficient voltage supply
System data loss
Do not switch off the PC and the BPC-Tool during the update and do not disconnect both from voltage sup-
ply.
Ensure sufficient voltage supply.
mega macs PC SE
.
.
Configuring the mega macs PC SE | 10.
149