4. Installation instructions
4.1.2. Tools required
1.
Drill.
2.
Drill bit for masonry, 8 mm (5/16 in).
3.
Screwdriver with bit holder.
4.
Spirit level.
5.
Pencil.
4.1.3. Power supply requirements
DANGER
Connecting the charging station to the power supply other than as specified in this section can result in
incompatibility of the installation as well as the risk of electric shock, and thus cause damage to the charging
station, and injury or death.
•
Connect the charging station only in a configuration that is specified in this section.
TN-S system
Earthing system
TT-system
IT-system
1-phase
Power input
(phase)
3-phase
•
Tripping characteristic: Type C.
•
The tripping current of the MCB can decrease if the ambient temperature in the power
supply cabinet becomes high. Consider potential higher ambient temperatures when
choosing the MCB specifications.
Note
MCB (Miniature
•
The installation, including the MCB, must be in accordance with IEC 60364 and any
Circuit Breaker)
applicable local regulations.
•
The MCB must match the amperage settings of the charging station and the maximum
current available for the charging station, in accordance with the MCB manufacturer
specifications.
•
The maximum I²t value of the MCB shall not exceed 75000 A²s.
6.
Wire stripper (power cable).
7.
Ferrule crimp tool.
8.
Wire stripper and crimp tool (RJ45).
9.
Tape measure.
10. Wire cutters.
PE-cable.
Earth electrode installed separately (self-
installed).
230 V ± 10%, up to 32 A ±6%, 50/60 Hz.
400 V ± 10%, up to 32 A ±6%, 50/60 Hz.
EN
15