Descargar Imprimir esta página

Portable Wet Installation; Level Control - salmson Rocsan EVO Serie Instalacion Y Puesta En Servicio

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 81
English
Fig. 2.: Wet installation
1
Suspension device
2
Return flow prevention
3
Shut-off valve
4
Pipe bend
Guide pipe (to be provided
5
by the customer)
A
Minimum distances in parallel operation
B
Minimum distances in alternating operation
Distance "A"
DN 50
308 mm
DN 65
385 mm
DN 80
615 mm
DN 100
615 mm
Working steps
1. Installation of the suspension device: about 3-6 h
(please see the operating manual for the suspension
device).
2. Preparing the pump for operation on a suspension device:
about 1-3 h (please see the operating manual for the
suspension device).
3. Installing the pump: about 3-5 h
• Check that the suspension device is firmly fixed and
functions properly.
• Secure the hoisting gear to the pump with the shack-
le, lift the pump and then lower slowly on to the guide
pipes in the operating area.
• Hold the electric power cables slightly taut when low-
ering.
• When the pump is connected to the suspension device,
make sure that the electric power cables are secured
adequately against falling off and being damaged.
• Have the electrical connections carried out by a qualified
electrician.
• The discharge port is sealed by its own weight.
4. Installing optional accessories, such as dry-run protection
or level controllers.
5. Starting up the pump: about 2-4 h
• As described in the "Start-up" section
• For new installation: Flood the operating area
• Bleed the discharge pipe.

5.4.2. Portable wet installation

With this installation type, the product must be equipped with a
pedestal (available as an optional extra). It is fitted to the intake
port and ensures the minimum floor clearance and a secure po-
sition on a firm foundation. This installation type makes optional
positioning in the operating area possible. For use on a soft foun-
dation, a hard base must be used to prevent the machine from
subsiding. A discharge hose is connected on the discharge side.
6
Lashing gear
Minimum water level for
7a
S1 operation
Minimum water level for
7b
S2 and S3 operation
8
Deflector plate
9
Intake
The unit must be anchored to the floor for longer operating times
with this type of installation. This prevents vibrations as well as
guaranteeing quiet and low-wearing running.
BEWARE of burns!
The housing components can heat up to well above
40°C. There is a danger of burns! After switching
off, let the product cool down to ambient tempera-
ture.
Fig. 3.: Portable installation
1
Load-carrying equipment
2
Pump pedestal
Pipe bend for hose con-
3
nection or Storz
fixed coupling
4
Storz fixed coupling
Working steps
1. Preparing the pump: about 1 h
• Mount the pedestal at the intake port.
• Attach the pipe bend to the discharge port.
• Fix the discharge hose to the pipe bend with the hose
clamp.
Alternatively, a Storz fixed coupling can be fitted to the
pipe bend and a Storz hose coupling to the discharge
hose.
2. Installing the pump: about 1-2 h
• Position the pump at the place of use. If necessary,
secure the lifting gear to the pump with shackles, lift
the pump and set it down at the intended operating
position (pit, shaft).
• Check that the pump is upright and standing on a firm
base. Do not let it subside!
• Lay the power supply cable so that it cannot be dam-
aged.
• Have the electrical connections carried out by a qualified
electrician.
• Lay the discharge hose so that it cannot be damaged
and secure at a suitable place (e.g. drain).
BEWARE of the discharge hose being pulled off!
Injuries may result from the discharge hose being
pulled or knocked off accidentally. The discharge
hose must be secured appropriately. Avoid kinks
in the discharge hose.
3. Starting up the pump: about 1-3 h
• As described in the "Start-up" section

5.4.3. Level control

Fill levels can be determined using the level control system, mean-
ing the unit is switched on and off automatically. The fill level
can be recorded using float switches, pressure and ultrasound
measurements or electrodes.
45
5
Storz hose coupling
6
Discharge hose
Minimum water level for
7a
S1 operation
Minimum water level for
7b
S2 and S3 operation

Publicidad

loading