Descargar Imprimir esta página

Machine Installation; Warnings; Preparation Of System For Installation; Connection To Mains Electricity - Bezzera ARCADIA DE BREWING PROFILE Manual De Instrucciones

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 105

4 - MACHINE INSTALLATION

4.1 Warnings

Installation must be carried out by qualified per-
sonnel, according to the instructions supplied by
the manufacturer and in compliance with current
laws.
The machine must be positioned and installed
in a place where use and maintenance are per-
formed exclusively by qualified personnel.
The machine can be used in places set up for staff
kitchen areas in shops, offices and other working
environments; holiday farm houses; by clients in
hotels, motels and other types of accommoda-
tion; bed and breakfast settings; etc.
4.2 Preparation of system for
installation
Prepare the machine's support on a flat horizon-
tal, even, dry, smooth, sturdy, stable surface po-
sitioned at such a height that the cup warming
surface is over 150 cm from the ground.
Do not use water jets, or install in places where
water jets are used.
To guarantee regular operation, the device must
be installed in places where the temperature is
between +5°C and +32 C and the humidity does
not exceed 70%.
If the machine is exposed to temperatures below
+ 0°C, proceed as follows:
- ensure that the machine has passed 24 hours
in a place where temperature is higher than +
15°C before turning it on.
The machine is powered by electricity and it needs
the following to operate:

- connection to mains electricity.

- connection to mains water.

- connection to drainage circuit.

4.2.1 Connection to mains electricity
Warnings:
- The connection to mains electricity must be
done by qualified personnel.
- The wiring must be done in compliance with
current laws and earthed.
BEZZERA ARCADIA BREWING PROFILE
MOD.
The machine is supplied with a power cord with-
out a plug; for a permanent electrical connection
between the appliance and the mains electric-
ity, fit a safety omnipolar switch with a minimum
opening between the contacts of overvoltage cat-
egory III, suitably sized for the load and in compli-
ance with the current regulations in force.
4.2.2 Connection to mains water
(Fig. 03)
Make sure that the water supply line is connected
to a drinking water network with operating pres-
sure between 0 and 6 bar (0 - 0.6 MPa).
If the water network has pressures above 6 bar
(0.6 MPa), install a
pressure reducer. Provide a water shut-off valve
upstream of the machine's connection.
The water inlet pipe (Fig. 03; pos. 1) has a G
3/8" thread.
Warning: Do not open the screw-on
cap and boiler exhaust valve: risk of
scalding. Use only the new inlet pipe
supplied.
4.2.3 Connection to drainage circuit
(Fig. 03)
Connect the rubber discharge pipe provided (Fig.
03; pos. 2) to the G 3/4" connector and to a
pre-installed open or serviceable drainage tape.

4.3 Instructions for water softener

(Fig. 04)
Prepare the machine connection as indicated in
Figure 4.
For use and maintenance, refer to the instructions
for the water softener
A – Connect to the water inlet pipe
B – Connect to the mains drinking water
43

Publicidad

loading