Load Capacity; Tools For Assembling The System Joint; Assembly Instructions - FIOR & GENTZ NEURO MATIC Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 76
Item
Description
1
wire, steel, 500mm long
2
cable cover with inner tube, 500mm long
3
lamination dummy for solenoid connection cable
4
lamination dummy for cable cover guidance
5
cable cover conduit made of plastic
w/o fig.
cloth bag for orthoses with logo

6. Load Capacity

The load capacity results from the relevant patient data and can be determined by using the Orthosis Configu-
rator. Use the system components determined by the Orthosis Configurator when producing an orthosis and
mind the recommended production technique. You will find information on the production techniques in the
section "Orthosis Production" under "Online Tutorials" on our website www.fior-gentz.com.

7. Tools for Assembling the System Joint

Tools
T8 hexalobular screwdriver/bit
T10 hexalobular screwdriver/bit
T15 hexalobular screwdriver/bit
T20 hexalobular screwdriver/bit
torque screwdriver 1-6Nm
combination pliers
side cutter

8. Assembly Instructions

The system joint is delivered fully assembled. All functions are checked beforehand. You have to disassemble
the system joint for mounting it in the orthosis and for maintenance. To ensure an optimal functioning, follow
the assembly instructions below. Secure all screws with the torque specified in paragraph 8.5.
When mounting the system joint, mind the correct basic alignment as it is essential for the later func-
tion of the orthosis (see also paragraph 11.1).
Quantity for
Construction
Unit
Unilateral
piece
2
piece
1
piece
1
piece
1
piece
1
piece
1
System Width
16mm
x
x
x
-
x
-
x
Bilateral
4
2
2
2
2
1
20mm
x
-
x
x
x
x
x
27

Publicidad

Tabla de contenido
loading

Tabla de contenido