8.4 Mounting the Extension Stop Damper
1 Turn the system joint upside down and place the extension stop damper
into the bore (fig. 20).
2 Bring the system joint in extension.
8.5 Securing the Screws
The screws are secured after the orthosis has been produced and tried on and before it is handed over to the
patient.
1 Secure the screws for the cover plate with the torque corresponding to the system width and
LOCTITE® 243 medium strength.
2 Let the adhesive harden (final strength after approx. 24 hours).
Position of the Screw
S1 (screw 1, axle screw)
S2 (screw 2)
The screws of the cover plate are not secured with the necessary torque at delivery.
You can also find information on the torque in the openings of the cover plate.
System Width
16mm
4Nm
3Nm
fig. 20
20mm
4Nm
4Nm
29