•
All holes should be sealed with silicone or foam.
•
Check with a sheet of paper that the fans blow in the right direction.
•
The drain circuit should be slanted on the condenser unit.
•
The drain circuit should be slanted on all evaporators and the moisture trap
should be installed.
•
The hole should be located at the expansion valve on all evaporators.
•
The temperature sensor should be connected on all evaporators (except to the
second evaporator when there are 2 ES 150 MAXs in the same
compartment).
•
The in-cab control box should be located in a spot that it is accessible and
visible from the driver's position.
•
The contact draw should be made.
(Rev. 4, 01/15)
Checking the Installation
•
Hoses should not be taut (they should be able to absorb vibrations and be
shortened in case of leaks).
•
Hoses should not rub against moving parts, sharp parts, or parts that can reach
high temperatures.
•
The oil return should be connected.
•
The fluid injection hole should be properly located (R-404A units only).
•
The compressor should be primed with oil.
•
The unit should be connected to the battery.
•
The drive kit test should have been carried out.
•
The seal test should have been carried out.
•
Check that the shutoff valves on the liquid container and the electric
compressor (units 20/50) are open.
Eng
54