Program Sequence - Bosch ACS 500 Instrucciones E Manejo

Aparato de servicios de aire acondicionado
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 75
ACS 500
..4.
Initial start-up
4.2.2

Program sequence

The recommended filling weight for initial
start-up is 6.5 kg.
The subsequent program sequence is descri-
bed using the following example values:
Empty weight of internal refrigerant cylin-
der: -800 g.
Recommended filling weight: 6500 g.
Filling weight of internal refrigerant cylinder
after initial filling: approx. 6100 g = -800 g
+ 6500g + 400 g (residual quantity in hose
lines).
Robert Bosch GmbH
Caution - risk of frostbite!
If refrigerant escapes, there is a risk of frost-
bite to the hands and body.
Wear protective goggles.
Wear protective gloves.
1.
Connect adapter with sealing ring to con-
nection on external refrigerant cylinder.
For connecting fittings with two shutoff
valves: Connect adapter to connection L
(liquid).
2.
Connect the red quick release coupling
(Fig. 1; 8) on the ACS 500 to the connec-
ting adapter on the external refrigerant
cylinder.
3.
Open the shutoff valve on the red quick
release coupling (turn clockwise).
4.
Open shutoff valve on external refrigerant
cylinder.
The current internal pressure of the
external refrigerant cylinder is displa-
yed on the high pressure manome-
ter (HP).
5.
Open the high pressure valve (HP) on the
ACS 500.
6.
Press the V key.
The maximum weight for filling is dis-
played.
7.
Enter the recommended filling weight
(6500 g).
8.
Press the V key.
Filling of the internal refrigerant cy-
linder begins. Follow the instructions
in the program.
"
After initial filling, the "Resources" option
in the main menu shows the current weight
of the internal refrigerant cylinder.
1 689 979 953 (2006-10-19)
en 

Publicidad

Tabla de contenido
loading

Tabla de contenido