Descargar Imprimir esta página

TOHATSU EverRun MX50D2 Manual De Servicio página 128

Ocultar thumbs Ver también para EverRun MX50D2:

Publicidad

Maintenance
a
a
b
b
18
18
15 10 5
15 10 5
1 1
3-24
All manuals and user guides at all-guides.com
10) Ignition Timing Adjustment
1.
Adjust ignition link and throttle link.
2.
Place advancer arm in the maximum speed position (wide
open throttle) and make sure the carburetor throttle is fully
open a. If throttle is not fully open, make fine adjustments
a
using throttle link.
Align flat surface of crankcase mold boss 1 with
3.
calibration marks on set ring and adjust ignition timing so
0
0
ignition timing matches the following specifications.
a Ignition Timing Link : 101 mm (3.976 in)
b Throttle Link : 115 mm (4.528 in)
Measure the length from ball joint center to shaft
center.
Ignition Timing-Full Throttle : BTDC 18°
GB
2st X50D2 2011

Publicidad

Capítulos

loading

Este manual también es adecuado para:

Everrun mwx 50d2