Descargar Imprimir esta página

Pre-Delivery Inspection; Tiller Handle; Gear Shift; Gear Oil - TOHATSU EverRun MX50D2 Manual De Servicio

Ocultar thumbs Ver también para EverRun MX50D2:

Publicidad

Service Information
å
ç
1-16
All manuals and user guides at all-guides.com

4. Pre-delivery Inspection

1) Tiller Handle

å Check installations for clattering and play.
∫ Adjust steering friction.
ç Check throttle grip for movement. (full open/full close).
∂ Adjust throttle friction.

2) Gear Shift

Shift into forward (F), back to neutral (N) and then shift
into reverse (R) to check that the shift operations are
smooth.

3) Gear Oil

Check quantity of gear oil.
GEAR
GEAR
GEAR
DANGER
Remove lock plate (of stop switch lanyard)
from stop switch before inspecting of gear
shift and throttle operations. This will
prevent engine from accidental starting.
Turn propeller then operate shift lever, to easily
when will not shifting.
Gear Oil :
OIL
MX50D2 : 500 cm
3
(16.9 fl.oz)
MWX50D2 : 700 cm
3
(23.65 fl.oz)
Leaking of some oil from plug hole as plug is
removed indicates that gear case is filled with
specified quantity of gear oil.
GB
2st 50D2 2011

Publicidad

Capítulos

loading

Este manual también es adecuado para:

Everrun mwx 50d2