Addenda A Summary Of Quick Operating - ADInstruments AD300 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

_____________________________________________________________________
Addenda A:
Summary of quick operating
J. Preparing
1. Verify that the machine is plugged in power or the battery
capacity is enough; then press
machine is booted.
2. In the standby mode, press
Move the cursor to [Edit Fusion Operation]; press
enter. Set [auto start] [pause 1],[pause 2] respectively as
"ON","OFF","OFF".
Discharge Calibration
3.
Discharge calibration is needed because constant changing of
atmospheric conditions such as temperature and pressure, and
the long service of the machine creates variability in the arc
temperature and position.
Step of discharge calibration
In the standby mode, press
Then prepare and place fiber according to the method
described in [fiber preparation]. Close the wind protector.
Press
calibration automatically starts. The user is recommended
to repeatedly prepare and place fiber in discharge
calibration interface, until the "Step II of discharge
calibration completed" message is displayed for three
times.
Discharge calibration is needed only arc power fluctuates
Note:*
©Copyright Abacanto Digital SA.
to enter "Splice Mode" menu.
:
to enter "Splice Mode" menu.
to enter [discharge calibration]. Discharge
Manual de usuario AD300
AD Instruments
and hold the key until the
to
179

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido