It is highly recommended to use the Tractel
guarantee the accuracy and the diameters of the holes
for the countersunk head socket screws M8 (see Fig. 18).
6.7. Setting corner parts
On both sides of the corner parts, there shall be two
brackets, one at 650 mm maximum of the corner end
and a second one in the limit of 6 m (according to
Fig. 19):
Depending on the configuration, some corners need to
be installed on a frame. In such a case, the assembly
requires a reinforcing bar (see Fig. 20). It shall be
considered as a structural support.
6.8. Supplementary rules for installing
rails for suspended works
IMPORTANT: In order that the rail keeps a
sufficient stiffness when being used in suspension,
supports shall be put every 3 m maximum. In order to
allow well-functioning of the suspension slider, rail shall
be set on a wall.
DANGER: The slider for suspended works is not
a fall arrest device, it must be used with a fall arrester
slider.
A pressure button is available on the rail in order to
block the slider moving for an easier work of the rope
technicians.
6.9. Placing the sign plate
The sign plate can be set up via self-tapping screws
or rivets.
The sign plat must be filled and placed at the access of
the rail. It can be added to this sign plate an installation
layout or rails layout.
It gives the information required before accessing to
secure site, for example, the number of operators per
rail, the last check date, and recommended personal
protection equipment.
IMPORTANT: The sign plate must be placed on the
rail. If there is not any sign by the rail, it cannot be used.
The sign plate is in particular compliant with marking
requirements of EN 365 and must be placed on the
anchoring device.
The sign plate shall indicate mandatorily:
• Name of the manufacturer (Tractel).
• Mention ordering the operator to read the instruction
manual.
drilling jig to
• Rail model: travrail.
®
• Number model equipment and year of the document
of the product compliance: EN 795-D 2012 and TS
16415:2013.
• Maximum number of operators (3 persons with a
maximum weight of 100 kg each).
• Commissioning date.
• Last check date.
• Name of the installer
To be indicated as a recommendation:
• The length of the rail.
NOTE: The deformation in case of fall does not
have to be indicated for rails.
Furthermore, on each rail component it shall be
mentioned:
• Name of the manufacturer (Tractel).
• Part reference.
• Component batch number.
• Norm reference.
• A pictogram "Please read the manual".
7. Lifespan, commissioning, annual
inspections and maintenance
7.1. Lifespan
TRACTEL
lanyards, ropes and energy absorbers, TRACTEL
Mechanical PPE equipment as stopcable™ and stopfor™
fall-arresters, blocfor™ self-retracting fall arresters,
lifelines and anchor points or system can be used without
restrictions from their manufacturing date providing that:
• A normal use is made in accordance with the
instruction manual,
• A periodical inspection, which must be accomplished
at least once a year by an approved and competent
technician. At the end of this periodical inspection, the
PPE must be certified fit to return to service, in writing,
• Instructions manual procedures for storage and
transport are strictly met.
7.2. Commissioning
"Installation schema & ID form" in section 13 shall
be fulfilled after the installation of the travrail rail by the
installer.
During travrail commissioning, the checklist below
must be checked and report any failure.
textile PPE equipment as harnesses,
®
GB
®
11