Nussbaum POWER LIFT HL 2.60 SST DG Instrucciones De Servicio página 100

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

temperatures below 5 degrees Celsius, use an ATF suffix hydraulic
oil (e.g. Oest). The required oil volume is approx. 17 litres. After
filling, the hydraulic oil must be between the upper and lower
marking on the oil dipstick.
All weld seams must have a visual inspection. Stop the system and
contact the manufacturer if there are cracks or breaks in weld
seams.
Check the powder coating and improve if required.
Damage by external influences is to be treated immediately after
detection. If these points are not treated, infiltration of deposits of all
kinds can cause wide-ranging and permanent damage.
These points are to be lightly sanded (120 grit), cleaned and
degreased. Afterwards, rework with a suitable touch up paint (note
the RAL No.).
Check galvanised surfaces, touch up as needed.
White rust is fostered by permanent humidity, poor ventilation. The
affected areas can be treated by using a sanding cloth (A 280 grit). If
required, the parts are to be treated with a suitable, resistant material
(paint etc).
Rust is brought out by mechanical damage, wear, aggressive
deposits (de-icing salt, leaking operating fluids) cleaning that is not
done or incomplete.
The affected areas can be treated by using a sanding cloth (A 280
grit). If required, post-treat the areas with a resistant material (paint
etc.).
Testing the safety devices. (CE STOP, warning signal, foot bumper,
receiving plate lock, receiving plate stopper, etc.)
According to a statement by the manufacturer, the battery on the
lean controller has a lifetime of 4 ½ - 5 years under normal operating
conditions. To prevent a permanent data loss after this time, the
charge condition of the battery must always be checked during
annual maintenance. The measurement may only be done after the
system is switched off. The measurement can be done with a
commercially available voltage meter.
Standard voltage of approx. 3.2 Volts (no exchange required), for a
value of ≤ 2.9 Volts, the lean controller must be removed and sent to
Nussbaum in Bodersweier.
Check the electrical lines for damage.
Check the state and function of the electrical boxes, push buttons,
signal lamps and labels for function and damage.
Check the condition of the cable conduits (riser/cross-beam).
Check the condition of the concrete floor in the area of the anchors.
If there are cracks in the area round the anchors, standing ssafety is
no longer assured.
Retighten all fastening screws using a torque screw.
(see the table in the detailed operating manual).
Opera ting Ma nua l a nd Inspection Book
POWER LIFT HL 2.60 SST DG
- 27 -
Min. 1x per year
Min. 1x per year
Min. 1x per year
Daily
Min. 1x per year
Min. 1x per year
Min. 1x per year
Min. 1x per year
Min. 1x per year
Min. 1x per year

Publicidad

Tabla de contenido
loading

Tabla de contenido