Single Safety Inspection Before Commissioning - Nussbaum POWER LIFT HL 2.60 SST DG Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

9.5 Single safety inspection before commissioning

Complete and leave in the inspection book
Test step
----------------------------------------------------------------------------------------------------------------------------- -----------
General condition of lift
Model plate........................................................
Quick operating manual...................................
Sticker load capacity........................................
Condition of the lift / lower / main switch buttons.. 
Condition of the "Balance" "Unlock" buttons........ 
Condition / function display.................................. 
Operating boxes condition.................................... 
Bridging switch function.......................
Condition / function lifting arm block...........
Interac. function Safety system..................
Function ease of travel of the lifting arm................ 
Condition of the elastomer receiving plate
+ receiving plate thread.
Carrier plate fuse.........................................
Securing the lifting arm bolts.............................
Condition of bolts and bearing seating.................. 
Condition of weld seams....................................... 
Load bearing construction (deformations, cracks) 
Condition of concrete floor (cracks...................
Fastening screw torque............
Fastening anchor torque....................
Unit condition ........................................
Piston rods surface condition
Condition of covers ..............................
Condition of the riser and upper cross-beam...... 
Hydraulic system leak-tightness ........................
Hydraulic oil filling level ...................................
Condition, hydraulic lines + screw fittings.
Condition electrical lines...................................
Functional test lift with vehicle.............
Function of equalization of the lifting rails............. 
Function CE-Stop + warning signal..................
(place a checkmark in the relevant, if a retest is required then check it again!)
----------------------------------------------------------------------------------------------------------------------------- -----------
Safety inspection done on:...................................
Performed by company:........................................
Name, address of specialist:................................
Result of inspection:
........................................................
Signature of specialist
If requested to take care of deficiencies:
Deficiency removed on: ..........................
(use a new form for reinspection!)
Opera ting Ma nua l a nd Inspection Book
OK
Defect missing Retest
.
............
 Continued operation questionable, reinspection required
 Continued operation possible, remove defects
 No deficiencies, continue to operate
- 36 -
POWER LIFT HL 2.60 SST DG
Serial number:______________
Remarks
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
...........................................................
Operating company signature
...........................................................
Operating company signature

Publicidad

Tabla de contenido
loading

Tabla de contenido