Manual Equalisation Of The Lift Rails - Nussbaum POWER LIFT HL 2.60 SST DG Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5.4 Manual equalisation of the lift rails

Access to the DIP switch may only be done by a trained, authorised specialist.
Caution, the vehicle and vehicle response must be monitored continuously.
If the controller detects a height difference of approx. 40 mm
between the lift rails, the lift automatically sets down.
To equalise the lift rails, some preparation must be done:
Open the control cabinet Caution voltage!!!
The lean controller with DIP switch is located in the control cabinet of the operating unit
(see figure 4).
DIP switch 5 (Controller on/off) (see figure 4)
DIP switch 1 (only lift rail 1 is movable)
DIP switch 2 (only lift rail 2 is movable)
DIP switch 7 (reset - null display, the lift is in the lowest position)
Perform equalisation:
If possible always move the lowest rail upwards.
After selecting lift rail 1 (control cabinet side) or 2 (opposite side)
Equalise the lower lift rail.
Place the DIP switch 5 to the "off" position (Controller off).
using DIP switch 1 or 2 to select the lowest rail and set it to the "On" position
Caution, observe the vehicle
Push the "Lift" button and simultaneously push the bridging knob (see page 6, figure 4)
until the lift rails are at the same height.
The values in the display are almost the same
Place the DIP switch 1 and 2 to the "off" position again.
Set DIP switch 5 to "on" position (Controller on)
Push the "Lower" button until the lift reaches the lowest position in order to do a reset.
(See Section 6.3 "Reset lean controller")
Close the control cabinet.
Figure 3:
Bridging knob (S6)
Lean controller
- 19 -
Opera ting Ma nua l a nd Inspection Book
POWER LIFT HL 2.60 SST DG
Figure 4:
DIP switch

Publicidad

Tabla de contenido
loading

Tabla de contenido