To protect the electrical cable all cable conduits are to be fitted with cable sleeves or flexible
plastic pipes.
After successful lift installation and before first commissioning, the operating company must
have the lift grounding conductors inspected on-site according to IEC regulation (60364-6-
61). An insulation resistance test is also recommended.

9.2 Set up and anchoring the lift

Before setting up the lift, ensure that everything possible is done to prevent accidents
due to careless assembly. This includes above all the use of safe auxiliary materials.
(e.g. cranes, forklifts and a sufficient number of people), diverse supports and a
sufficient barrier to prevent unauthorised access to the lift.
Tip: Bare concrete has long-term chemical evaporation that encourages corrosion of
the baseplates. We recommend covering bare concrete with a protective paint before
assembling the lift (e.g. provide a 2 component epoxy floor coating).
Carefully remove the lift from the wooden crate and check for damage.
Position and align the lift columns according to the data sheet at the desired set up location.
Guide the power supply line to the operating column (on-site).
Mount the riser and cross-beams.
Connect the electrical cables and measurement cables to both columns.
.
Check the position of the lift again.
Fill with approx. 17 litres of clean hydraulic oil into the oil container of the unit.
• Holes for floor anchorings are to be placed through the holes in the base plates. Clean
the bore holes by blowing them out with air. Guide the safety anchor into the drilled
holes but do not fasten them yet.
The lift manufacturer recommends Liebig safety anchors or similar anchors from other
reputable anchor manufacturers Hilti, Fischer (with approval) while following their
conditions.
• Before anchoring the lift, check whether the load-bearing concrete is of quality min. C20/25 up
to the finishing level of the completed floor.In this case, take the anchor length from "anchor
length without floor covering".f there is a floor covering (tiles, screed) on the load carrying
concrete, the thickness of this covering must be determined and the anchor length selected
according to "anchor length with floor covering".
Push the "LIFT" button briefly. Note the rotation direction of the motor.
If the lift rail does not lift, the rotation direction of the motor must be checked again and if
required two phases of the power supply must be exchanged. (only for 3-phase AC supply)
• Check the precise vertical set up of the lift columns and if required make sure there is
a suitable support (panel strips) that make contact with the floor.
To prevent vertical oscillations of the column, it is necessary to position the support in
the middle and not only on the edge of the base plate.
• Tighten the anchor to the required torque (see the conditions of the anchor
manufacturer).
Each anchor must be tightened to the required torque. Safe operation and stability of
the lift are not guaranteed with a lower torque.
If required, do a reset before first operation. (see Section 6.3)
Raise the lift approx. 800 mm.
Mount the lifting arm. Secure the bolts with the locking rings.
The lift must be moved to the "lift" and "lower" end positions without a vehicle.