Descargar Imprimir esta página

Grundfos LSV Serie Instrucciones De Instalación Y Funcionamiento página 17

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 215
4. Starting up the product
4.1 General information
Do not start the pump until it has been
filled with liquid and vented.
CAUTION
Biological hazard
Minor or moderate personal injury
When pumping drinking water, the
pump must be flushed thoroughly with
clean water before startup in order to
remove any foreign matters, such as
preservatives, test liquid or grease.
4.1.1 Pumps with stuffing box
In the case of pumps with stuffing box, check that the
stuffing box gland is correctly fitted. It must be
possible to turn the pump shaft manually. If the pump
has been inactive for a long period, turn it manually to
make sure it has not got stuck. Loosen the stuffing
box or remove the packing.
4.1.2 Flushing the pipe system
The pump is not designed to pump liquids
containing solid particles such as pipe
debris and welding slag. Before starting up
the pump, the pipe system must be
thoroughly cleaned, flushed and filled with
clean water.
The warranty does not cover any damage
caused by flushing the pipe system by
means of the pump.
The startup procedure for the pumps has four steps:
1. Prestart checks. See section Prestart checks.
2. Priming. See section Priming.
3. Starting. See section Startup.
4. Final alignment. See section Final alignment.
Only start the pump when you have
gone through all of the prestart checks.
Related information
4.2 Prestart checks
4.3 Priming
4.4 Startup
4.5 Alignment
4.2 Prestart checks
Prestart checks have four steps:
1. Bearings
2. Stuffing boxes
3. Pressure gauge
4. Direction of rotation.
4.2.1 Bearings
Make sure that all bearings are properly lubricated.
See section Lubrication.
Related information
6.3.3 Lubrication
4.2.2 Stuffing boxes
Make sure that the stuffing box packing rings have
been properly tightened.
This does not apply to pumps with
mechanical shaft seals.
4.2.3 Pressure gauges
Make sure that the pressure gauge connections are
closed.
17

Publicidad

loading