Testing Procedures; Instructing The Operator; Final Checks; Instructions For The Operator - John Bean QUADRIGA 1000 Manual Del Operador

Tabla de contenido

Publicidad

128
Installation Instructions
IV

Testing procedures

Motor rotation check
This type of check must be made on machines at the
end of installation only.
• Press the turntable rotation control pedal: the wheel
must start and turn clockwise.
Should it rotate anticlockwise the machine must be
stopped and must not be used until it has been repaired
by an authorized technician.
WARNING: ANY DAMAGE CAUSED BY NON
APPLICATION OF THE ABOVE INSTRUCTIONS
S H A L L N O T B E D E B I T E D T O T H E
MANUFACTURER AND SHALL VOID THE
WARRANTY.

Final checks

When you start up the machine for the fi rst time you
should:
• Check hoses and hose connections for air leaks.
• Check the oil level in the hydraulic control unit tank.
If necessary, top up the hydraulic circuits to the level
indicated with ESSO Niuto H46 or a similar type oil.
v Instructions for the operator
The following only applies if a unit is installed by a
Service Technician, who should do the following:
• Run the tests required at the end of machine instal-
lation.
• Show the operator how to switch the unit on and
off.
• Show all machine manoeuvres to the operator.
• Explain to the customer how to perform machine
maintenance.
• Deliver the Use and Maintenance instruction ma-
nual, the Compliance Declaration and any other
documents, such as the Machine Spare Parts
Handbook.
Operator's Manual
QUADRIGA 1000/BB
QUADRIGA 1000/BB

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido