Descargar Imprimir esta página

Sun ECK TWIN 12 Manual De Instrucciones página 40

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 471
VACUUM
Use the quick-connect couplings to connect the hoses to the A/C system, bearing in mind that
BLUE must be connected to the low pressure side and RED to high pressure. If the system is
equipped with a single quick-connect coupling for high or low pressure, connect only the
relative hose.
From the MANUAL PROCEDURE, select VACUUM.
The following screen will be displayed:
Use the KEYPAD to insert the new value of the VACUUM TIME, press ENTER to confirm,
ESC to return back.
NOTE: if selected VACUUM TIME is lower 15 minutes the following popup warning will be
displayed:
INSTRUCTIONS MANUAL
MANUAL
RECOVERY/RECYCLE
VACUUM
OIL INJECTION
CHARGE
FLUSHING HOSES
VACUUM
25
VACUUM TIME
Vacuum time
(Min 2, Max 120 min)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-39-
DD/MM/YY XX:XX PM
ESC
DD/MM/YY XX:XX PM
ESC
ENTER
ESC
ENTER
ENTER

Publicidad

loading

Este manual también es adecuado para:

Dual gas 12v