John Bean B 600 Manual Del Operador página 84

Ocultar thumbs Ver también para B 600:
Tabla de contenido

Publicidad

26
84
5-43
26
5-44
5-45
5-46
5-47
5-47
Operation
Figure 5-43 OPTIMISATION "OP.2"
START is signalled on the screen.
— Perform the wheel measuring run.
A compensation run is performed.
The OPTIMISATION "OP.3" screen is displayed
5-44).
Figure 5-44 OPTIMISATION "OP.3"
— Mount the tyre correctly on the rim (follow the
centring line) and inflate to specified inflation
pressure.
— Confi rm by pressing menu key 26.
The OPTIMISATION "OP.4" screen is displayed
5-45).
Figure 5-45 OPTIMISATION "OP.4"
(fi rst measuring run with tyre)
— Clamp the wheel.
— Position the valve so that it is exactly perpendicular
to and above the chuck.
— Confi rm the valve position by pressing menu key
26.
The OPTIMISATION "OP.5" screen is displayed (Fig.
5-46).
Figure 5-46 OPTIMISATION "OP.5"
START is signalled on the screen:
— Perform the wheel measuring run.
A measuring run is performed.
The OPTIMISATION "OP.6" screen is displayed (Fig.
5-47).
(
Fig.
(
Fig.

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido