Wheels With 5-Piece Split Rings - Nussbaum TTC 600 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

(1*/,6+ ‡ ,QVWUXFWLRQV PDQXDO
14) Take the mobile control unit to work position B.
15) Move the platform towards the outside until the tyre is completely off the
rim. Watch out for the valve!

WHEELS WITH 5-PIECE SPLIT RINGS

1) Clamp the wheel on the spindle as described previously and make sure it is
deflated.
2) Take the mobile control unit to work position C.
3) Lower the tool carrier arm (14, Fig. D) to its work position until its hook has
clicked into position on the bar.
4) Use the joystick to position the wheel so that the bead breaker disk touches
up against outside edge of the centre well rim.
5) Turn the spindle and at the same time move the bead breaker disk forward
until the split-ring is detached. Watch out for the O-ring.
6) Repeat this operation but this time move the disk against the split-ring (See Fig. Z) until the locking ring is released.
This ring can be removed with the special LC lever (19, Fig. Z) or with the help of the bead disk.
7) Remove the O-ring
8) Move the tool carrier arm (14, Fig. D) back from the edge of the rim.
Release the hook and tip the arm to its non-working position.
Move the tool carrier arm to the inside plane of the wheel.
9) Press lever (19, Fig. D) and turn the tool head 180° which will automatically lock in this position.
Lower the arm to its working position.
10) Take the mobile control unit to work position D.
11) Turn the spindle and at the same time bring the bead loosener disk up against the tyre between the rim and bead.
Move the disk into the tyre only when the bead has started to detach from the rim and move the bead to the outside edge of the
rim.
NB: Lubricate during this process.
12) Tip the tool carrier arm to its non-work position.
13) Take the mobile control unit to work position B.
14) Move the platform (4, Fig. A) directly under the wheel.
15) Lower the spindle until the wheel is resting on the platform.
16) Move the platform towards the outside until the tyre together with
the split ring comes completely off the rim.
17) Remove the rim from the spindle.
18) Position the tyre on the platform with the splint ring turned towards
the spindle.
19) Clamp the split ring on the spindle as explained in the section of
CLAMPING THE WHEEL.
18
14
13
47
K
17
19
15
D
TTC 600

Publicidad

Tabla de contenido
loading

Tabla de contenido