Commissioning; Unpacking; Machine Movement - WERTHER INTERNATIONAL MERCURE 200 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

en
52 | MERCURE 200 | Commissioning
4.

Commissioning

4.1

Unpacking

1. Remove the steel band and fasteners.
2. Carefully lift off the packaging.
Fig. 8:
3. Remove the accessories and packaging material from
the packaging unit.
Fig. 9:
i Check that the MERCURE 200 and the accesso-
ries are in proper working order and that there are
no visible signs of component damage. In case of
doubt, do not start up the unit and consult customer
service.
i Remove the accessories and packaging material from
the packaging unit.
4.1.1

Machine movement

i On delivery, the machine is fastened to the wooden
pallet with 3 bolts.
|
1 695 109 017
2019-01-07
Fig. 10:
1. Slacken off the 3 bolts with which the MERCURE 200
is attached to the pallet.
2. Remove the dummy plug on the balance weight stor-
age tray.
Fig. 11:
3. Hand-tighten the threaded lug.
Fig. 12:
Werther International S.p.A.

Publicidad

Tabla de contenido
loading

Tabla de contenido