Installation Of Display - WERTHER INTERNATIONAL MERCURE 200 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4.4

Installation of display

1. Slacken off the 4 bolts and take the display and op-
erating unit out of the plastic mount;
Fig. 21:
2. Guide the keypad cable on the back of the machine
through the support arm of the display and operat-
ing unit;
Fig. 22:
3. Use the three bolts included in the scope of delivery
to attach the support arm of the display and operat-
ing unit to the machine;
Fig. 23:
4. Use the three bolts included in the scope of delivery
to attach the display mount to the support arm;
Werther International S.p.A.
Commissioning | MERCURE 200 | 55
Fig. 24:
i Guide the keypad cable through the opening in the
plastic mount.
Fig. 25:
5. Connect the keypad cable to the display and operat-
ing unit;
Fig. 26:
Installing display and operating unit
1 Keypad cable
6. Re-attach the display and operating unit in its mount.
Fig. 27:
en
|
1 695 109 017
2019-01-07

Publicidad

Tabla de contenido
loading

Tabla de contenido