2
_To
install bagger components to tractor
I
1. Discharge Chute
2.
3/8 Nut
3.
Flat Washer
3
1. SupportBracket
2. 3/8 Carriage Bolt
1
3. 3/8 Lock Nut
4.
3/8 x 63,5mm Hex Bolt
5.
10,3mm
(13/32")
flat
washer
5
2
•
Removedischargechutefromrearoftractor.
Unhook the
two (2) strops and pull chute out and away from tractor.
•
Remove the two (2) 3/8 nuts and fiat washers from the
bolts at the tractor back plate.
•
Install the two upper support brackets through the back
plate and to the chassis, usingthe 10 x 19 mm (3/8'x3/4")
carriage bolts and Iocknuts supplied. Tighten sscurely.
•
Assemble both support brackets to the outside of the
baggger support tuba using two each 3/8 x 63,5mm hex
bolts13/32"
I.D. fiat washers and 3/8 Iocknuts from parts
bag. Tighten securely.
1,
2.
3.
3/8 Lock nut
Flat Washer
Support Tuba
1
Using the nuts and fiat washers removed from tractor
back plate, install the bagger support tube to the back
plate as shown. Tighten securely.
1.
Hook
2.
Discharge Chute
3.
Back plate slot
•
Replace discharge chute into rear opening of tractor.
Secure the chute with the two hook straps.
NOTE: The strap hook must go through the discharge chute
only. Do not allow the hook to enter the slot in the tractor
back plate. This will allow the discharge chute to float withthe
mower deck when moving on uneven terrain.
23