2.3.7.1. Connections (charge, remote start, preheating, earth)
1
Remove the cable router blanking cover.
3
Remove the circuit breaker cover.
5
2
Drill a hole in the cover (3 holes of the correct diameter for
the cable gland and cables).
Position the cable gland via the drill holes then refit the cover.
4
Feed the cables via the cable gland.
Connect the cables.
Figure 2.25: Electrical connections onsite
25/73