6
Connection markings
1 - Remote start command
2 - Earth
3 - N5: Mains neutral
R5: Mains live
4 - Label indicating connection markings.
Read the written guidelines carefully.
Remove label once connections
complete
5 - Power connection
6 - "VIGI" module - differential protection (option)
7 - Earthing cable.
Note on adjusting the normal/emergency switch (SDMO).
In "AUTO" mode, to ensure the engine is correctly cooled after it is switched off, the cooling time delay for the generating
set should be set to 120 seconds.
7
Perform the following checks. Check that:
the cables are secured by the cable glands
the cables are not under any mechanical stress between
the cable glands and the connectors.
Refit the circuit breaker cover.
Figure 2.25 (continued): Electrical connections onsite
26/73
1
2
3
4
8
Final configuration
5
6
7