Descargar Imprimir esta página

Corghi Artiglio 50 Manual De Uso página 64

Ocultar thumbs Ver también para Artiglio 50:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

- Start rotation again (pedal 2) until the clamp 1 is close to the bead breaker disc and
remove the clamp 1 (E).
- When mounting is complete, raise the bead breaker disc (control 5).
9 • Move the bead breaker unit to the rest position (fig.30)
10• Tyre inflation
- For inflation, see "INFLATION" section
11 • Releasing the wheel from the turntable (fig.32)
- Undo the device by turning the handles 1 anti-clockwise (A).
- Press the retainers 2 and move the centring cone away from the rim by hand (B).
- Turn the clamping device anti-clockwise to release it from the turntable (C).
- Remove the device from the rim (D).
12 • Unloading the tyre (fig.33)
- Lower the wheel lift (pedal 1) and position the wheel on it by hand (A).
- Lower the lift (pedal 2) (B).
- Remove the wheel from the lift (C).
"EXTRAORDINARY" MOUNTING
- One variation of the mounting procedure explained above may be adopted in case of
rims with very small or non-existent drop centre (fig.8a). In these exceptional cases, the
mounting procedure can be facilitated by using a variant of the normal procedure.
- The first bead is mounted in the usual way. To mount the second bead, position the
mobile tool as during the demounting search stage (fig.18d).
- This reduces the stresses, leaving more space for the tyre. The following operations
illustrated from fig.29 onward remain unchanged.
APPROVED M/D PROCEDURE FOR UHP
For the detailed M/D procedure for UHP and RUN FLAT tyres, please refer to the
instruction manual wrote by WDK (German Association of the Tyre Industry)
64
PROCEDURE
AND RUN FLAT TYRES
Operator's manual Artiglio 50

Publicidad

loading

Este manual también es adecuado para:

4-103676e