Descargar Imprimir esta página

Set Up; Unpacking And Setting Up Your Analyzer; Important - Adam Equipment PMB 53 Manual Del Operador

Publicidad

Idiomas disponibles

Idiomas disponibles

 

3.0 SET UP

3.1

UNPACKING AND SETTING UP YOUR ANALYZER

Remove the PMB from the packing by carefully lifting it out of the box. Inside
the box you will find everything needed to start using the analyzer-

IMPORTANT:

Before applying power make sure the PMB is configured for the power in your
area. The analyzer will have a label on the rear panel showing the voltage
required. 115VAC (±10%) or 230VAC (±10%). If the label does not match
your power do not attempt to use the analyzer, damage to the PMB could
result.
The PMB should be positioned to allow easy access to the mains power
connection on the rear panel. Ensure the power cable is fully engaged to
ensure safe operation.
 
5
|
P a g e
AC power cable
Pan Support
Stainless Steel Lower Chamber Insert
Sample Pan Lifter
Sample Pans (x10)
Spare Fuse 5A, Time Lag, High capacity
This User Manual
For PMB supplied from the USA only:
 RS-232 Interface Cable for use with a PC
 USB to PC cable
 USB driver software on CD
© Adam Equipment Company 2017

Hide quick links:

Publicidad

loading

Este manual también es adecuado para:

Pmb 163Pmb 202Pmb