Descargar Imprimir esta página

Assembling The Analyzer - Adam Equipment PMB 53 Manual Del Operador

Publicidad

Idiomas disponibles

Idiomas disponibles

 
3.2

ASSEMBLING THE ANALYZER

For best performance, let the analyzer warm up for 30 minutes before using.
For some applications it is desirable to run the analyzer in a dummy run to
warm up the weighing chamber and the surrounding area before doing the
actual test. See section 14 for other ideas to help ensure accurate test
results.
 
6
|
P a g e
 Locate the PMB on a solid
surface, free from vibration with
good ventilation around it.
 Place the lower reflector (1) into
the
base
chamber
 Gently place the pan support
(2) into the access hole. Rotate
to position.
 Place the sample pan lifter (3)
into the weighing chamber,
rotate so the tangs on the lifter
do not interfere with the pan
supports and the handle exits
the chamber using one of the
gaps in the cover.
 Place
an
weighing tray (4) on the pan
support
 Level
the
adjustable feet and spirit level
© Adam Equipment Company 2017
of
the
weighing
empty
aluminium
PMB
using
the

Hide quick links:

Publicidad

loading

Este manual también es adecuado para:

Pmb 163Pmb 202Pmb