Restart drilling process and check distance between last
drilling of 1st drilling process and 1st drilling of second
drilling process
7.
The distance can be checked best by inserting two 5 mm
pins into the drillings. For this, you must use a calliper
and measure from the outer edge of the pins
produce a dimension of 37 mm (32 mm distance between the
drillings + 2 times 2.5 mm = 37 mm).
If the dimension differs, the continuation stop must be
readjusted.
For this, undo the screw at the pendulum and tighten or
slacken the grub screw using a hexagon socket spanner
(1 turn = 0.8mm)
9.
. This must
8
8
9
7
7
en
117
117