4 INSTALLATION
Discharging and handling the rolling machine
The mixer discharging and handling
operations must be performed using a lift
truck or transpallet, by qualified personnel.
Subsequently remove the machine by
lifting from the packaging.
Positioning of the rolling machine
The mixer installation operations must be
performed
by
qualified
according to the local, national and
European regulations.
Make sure the stand or bearing surface is
levelled.
After removing the machine from the
special packaging, place it
in the location envisaged, taking into
account the minimum safety distances
from the
walls and/or other equipment to facilitate the use and cleaning operations. Please find on the side a diagram indicating how to
position the machine.
Remove any polystyrene protections and protective film; avoid using tools that can damage the surfaces.
Electrical connection
The mixer is provided with a power cable with SCHUKO plug in single-phase version, without plug in the three-phase versions.
The connection to the power network must be performed by interposing a differential circuit breaker switch having suitable
features, and minimum opening distance between the contacts of at least 3 mm.
In the single-phase version it suffices to connect the machine to the power plug; in the three-phase version is necessary to
apply a 4-pole plug 400V - 16A (not supplied).
m
ALSO FOLLOW THE PROVISIONS GIVEN BELOW:
•
The mains socket must be easily accessible and should not require moving the mixer.
•
The electrical connection must be easily accessible even after the mixer has been installed.
•
The distance between the mixer and the socket must be such not to have the power supply cable stretched.
•
If the power cable is damaged, have it replaced by the technical assistance service or by a qualified service technician in
order to prevent any risk.
Earthing
m
It is mandatory for the system to be provided with an earthing system.
According to the regulations in force, it is required to connect the equipment to an equipotential system whose efficiency must
be properly verified as prescribed by the rules in force.
personnel
22