Descargar Imprimir esta página

TDK relyon plasma piezo brush PZ3-i Manual De Instrucciones página 18

Unidad de integración
Ocultar thumbs Ver también para relyon plasma piezo brush PZ3-i:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 151
Turn the locking ring on the module carrier anti-clockwise into its 'open' position (red).
Install the desired exchange module in the module carrier. For this, grip the front area
from outside, as shown in this illustration, without touching the piezo element. With the
adhesive label facing upwards, it is easy to slide the exchange module into the module
carrier. Ensure that the exchange module is installed as deeply as shown in this
illustration. Turn the locking ring on the module carrier clockwise into its 'closed' position
(green).
Grip the module carrier as shown and place it on the driver housing by sliding it onto the
two locating pins from the front and then pressing it firmly against the driver housing.
5.4.2 Installation with separate positioning of driver housing and module carrier
Secure the driver housing as described in 5.4.1.
Remove both locating pins from the front of the driver housing (waf 2.5 Allen key).
In accordance with the bore pattern, prepare a locating bore to accommodate the
module.
Screw both locating pins into the locating bores.
Install the module in the module carrier as described in 5.4.1.
Set the module carrier on the locating pins and press this firmly home.
Please note that EMC compatibility levels were only measured on 0.3 m lengths of cable
between module carrier and driver housing. Lengths beyond this can cause deviations
from these measurement results depending on the routing in the installation and, in case
18
BA-PZ3_i_ML / F0354902

Publicidad

loading

Productos relacionados para TDK relyon plasma piezo brush PZ3-i