Descargar Imprimir esta página

TDK relyon plasma piezo brush PZ3-i Manual De Instrucciones página 19

Unidad de integración
Ocultar thumbs Ver también para relyon plasma piezo brush PZ3-i:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 151
of doubt, would have to be measured by the company operating the system in the given
integration situation.
For both mounting variants, the two grub screws on the bottom of the module carrier
retaining ring can be tightened to deactivate the tool-free removability of the module
carrier.
This is recommended if, due to the installation situation, the exchange module can be
easily accessed without removing the module carrier.
5.5
Connecting up the gas supply
Connect up an appropriate gas hose with an external diameter of Ø 4 mm.
Press this into the push-in fitting deep enough to secure it firmly. Check that the hose is
fitted tightly before applying pressure to it.
BA-PZ3_i_ML / F0354902
19

Publicidad

loading

Productos relacionados para TDK relyon plasma piezo brush PZ3-i