Start up / trial run
Restart drilling process and check distance between
last drilling of 1st drilling process and 1st drilling of second
drilling process
7
7
The distance can be checked best by inserting two 5 mm pins
into the drillings. For this, you must use a calliper and measure
from the outer edge of the pins
. This must produce
8
a dimension of 37 mm (32 mm distance between the drillings
+ 2 times 2.5 mm = 37 mm)
en
8
7
If the dimension differs, the continuation stop must be
readjusted.
For this, undo the screw at the pendulum and tighten
or slacken the grub screw using a hexagon socket spanner
(1 turn = 0.8mm)
9
9
126