Start up / trial run
10. Carrying out trial run
We recommend first carrying out a trial run without
material and drill bits to test all functions for proper
working order.
If all functions are working properly, fit the required tool.
Depending on connection, use the foot or manually
operated switch for function testing.
Start a trial run without material. Afterwards, you should
carry out a test with material.
Check work for correct results. You can start production
if all settings are correct.
Pushbutton:
1 = pushbutton
Pressing pushbutton
operation.
You must keep the pushbutton pressed until the work
operation has been completed or the process will
immediately stop.
2 = rotary switch
en
Setting for drilling with insertion, rotary switch points
upwards.
Setting for drilling a hole line only, rotary switch points
downwards (see photo).
3 = pushbutton
For manually releasing the hold-down clamp.
4 = foot switch
Foot switch
is used for initiating a work operation and
4
must stay pressed down until the work operation had
been completed or the process will immediately stop.
Pushbutton
is not operational when using the foot
1
pedal.
Information on trial run
Once you have made and checked all settings, carry out
a trial run.
Preliminary conditions
• All of the necessary activation processes must have
been carried out.
• The compressed air must be turned on.
• The machine must be set up for the relevant product.
• Make sure the machine is running smoothly and not
erratically.
• The operator must always be informed about current
work procedure.
132
manually initiates a work
1
1
2
3
4