Setting up
7. Hold-down clamp and centre stop
Hold-down clamp
Depending on panel thickness, hold-down clamps must
be vertically adjusted.
Workpiece and hold-down clamp foot
apart by no more than 6 mm (if necessary, place an
A/F 5 mm hexagon socket spanner underneath).
To set spacing, undo clamping screw
hold-down clamp
1
Tighten clamping screw once correct height is achieved.
Note!
The compressed-air supply must be switched off
when performing this setting work!
en
Hold-down clamp
1
workpiece is securely clamped in place for drilling.
Undo clamping levers
Re-tighten clamping levers after positioning.
Caution!
Do not move the arm under the drilling head.
142
must be spaced
3
and re-position
2
in its retainer.
must be moved into position to ensure
to set the hold-down clamp.
4
1
max. 6 mm
1
3
4
4
2