Switching On; Preparatory Work; Operation - Hettich BlueMax Mini Modular Instrucciones De Servicio

Ocultar thumbs Ver también para BlueMax Mini Modular:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 278

2. Switching on

Preparatory work

• Connect to the power supply by plugging in the mains
plug,
• connect to compressed-air supply, switch this on and
• prepare material: panels, hinges / connectors etc.

Operation

You can operate the machine either by foot pedal or
pushbutton on the control unit. The machine cannot be
operated via foot switch and pushbutton at the same time.
Turn on the power supply for the drive motor at master
switch
.
1
The same functions are given for foot pedal
and
2
pushbutton
on the control unit.
3
Both controls must remain pressed until a complete work
operation has been completed.
1
3
If you release the pushbutton or foot switch beforehand, the
machine will abort the work operation and the drilling unit
will return to the home position.
en
You must re-start the process.
2
147

Publicidad

Tabla de contenido
loading

Tabla de contenido