Descargar Imprimir esta página

Stenner Pumps S Serie Manual De Instalación Y Mantenimiento página 94

Dosificador peristáltico
Ocultar thumbs Ver también para S Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

S30 & S40
TUBE REPLACEMENT
Back of
latch open
Front of
latch secure
N
Prepare to center tube
1/8 Turn
O
Center tube
P
Secure latches
S Series FW 4.01.02 US and Canada 800.683.2378, International 904.641.1666 www.stenner.com
S30 – CENTER THE TUBE & FINAL INSTALLATION
1. Lift the latch located between the tube fittings, leaving the end of
the latch engaged with the lip on the tube housing cover. Leave the
latch on the opposite side engaged. N
2. Plug the pump in. Depress the prime button and turn the tube
fitting on the suction side not more than 1/8 of a turn in the
Closed latch
direction the tube must move O.
3. Do not let go of the fitting until the tube rides approximately in the
center of the rollers.
4. Release the prime button, let go of the fitting, and secure the latch
between the fittings. P
5. Inspect the suction and discharge lines, point of injection, and check
valve for blockages. Clean and/or replace as required.
6. Reconnect the suction and discharge lines.
7. Prime pump and verify operation.
8. Place pump in desired operating mode.
S40 – FINAL INSTALLATION
1. Inspect the suction and discharge lines, point of injection, and
check valve for blockages. Clean and/or replace as required.
2. Reconnect the suction and discharge lines.
3. Prime pump and verify operation.
4. Place pump in desired operating mode.
94
continued

Publicidad

loading

Este manual también es adecuado para:

S30S40S50