Bearing inspection
Item 1
Item 2
Screw plug
Figure 12: Three-row roller bearing slewing ring with grease sampling ports
Take the grease samples from the main loading zone.
Remove the screw plug (M16 EN ISO 4762) selected
for taking the sample: item 1 and if necessary item 2
opposite (fi gures 12 and 13).
Before taking the grease sample, cut the supplied tube
at an angle of 45° so that it is slightly longer than the
grease sampling port. Then insert the tube into the race-
way area of the port (fi gure 14).
Figure 14: Taking a sample
Item 1
Screw plug
Figure 13: Single-row ball bearing with grease sampling port
Make sure that the surface cut at 45° faces in the oppo-
site direction to the direction of rotation (fi gure 15).
The sampling ports must be closed again with the
screw plugs.
When the sample has been taken, close both tube
ends with the plastic caps.
Number the grease sample and place it in the labeled
sample box.
Add the necessary information (see the grease sampling
set in fi gure 11 on page 16) to the top of the sample box.
Figure 15: Detail of the sampling
17
®
English