ENGLISH
Do not push or drug the device during
installation to avoid tipping or damages to parts of
it.
!
This appliance can only be installed and
operate
in
ventilated, in order to guarantee correct operation.
Connect and leave for a certain period of time
(at least 2 hours) before checking functioning.
During transport, it is probable that the compressor
GB
lubricant oil has entered the refrigerant circuit
blocking the capillary: as a consequence the
appliance will function for a certain period of time
without producing cold until the oil has returned to
the
compressor.
The equipment requires the following
minimum functional spaces:
•
at least 10 cm from the top
•
30 mm from the back panel
To avoid condensation on the walls of the
equipment, it is advisable to keep at least 20 mm
between one unit and the next.
6.3.
Electric Power Supply Connection
Connection must be carried out by authorised and
qualified
staff,
regarding the subject and using appropriate
prescribed material.
Before connecting the appliance to the
electric mains, check that the voltage and the
frequency correspond to the data stated on the
registration plate applied on the rear of the
appliance.
The equipment is supplied with one of the
following operating voltages:
•
230V 1~ 50Hz
•
220V1~ 60Hz.
!
Provide an earthed socket with a capacity
appropriate to the absorption indicated on the
identification plate.
!
It is forbidden to operate the equipment
connected to an ungrounded system.
!
For direct connection to the power supply, a
device must be provided to ensure disconnection
from the power supply, with a contact-opening
distance allowing complete disconnection under
rooms,
which
are
permanently
respecting
the
current
The defrosting water and the water that forms
at the bottom of the refrigerating compartment
during operation or during periodical internal
cleaning must be drained through a prearranged
hose with a minimum diameter 3/4" connected to
the hose at the bottom of the chiller.
A drain trap should also be guaranteed. The drain
must comply with Standards in force.
!
The size of the compartment that houses the
equipment must be such as to avoid excessive
concentrations of gas in the event of a leak from
the refrigeration circuit and in any case, the
compartment must have a free area NEVER
smaller than 4 times the space occupied by the
equipment. Adequate space must be provided to
ensure effective escape routes at all times. The
above-mentioned compartment must be well
ventilated.
the conditions of overvoltage category III, in
laws
accordance with the installation rules.
Refer to the technical data on the
identification plate for the correct sizing of the
switch.
The switch-disconnector must be located
close to the equipment, must be visible to the
operator and must be indicated by an information
sign.
!
If a plug is used, it must comply with national
installation regulations.
!
The plug must be accessible even after the
equipment has been placed in the installation
location.
The plug must always be visible to the
operator performing the maintenance operation.
After the electrical connection, check that the
supply voltage, when the equipment is running,
does not deviate from the nominal value given on
the specifications plate ±10%.
The power cable used for connection to the mains
supply is of type H05VV-F; when replacing it, use a
cable with the same or better characteristics.