1. Attach the Patient Module to the Control Unit prior to power up of the NVM5
2. Plug the Power Cord into a hospital grade power receptacle.
3. Press the Power Switch.
Bendini
Equipment Setup
®
•
Ensure all equipment is turned on and functioning properly prior to use.
•
Tracking System includes a Camera with an attached IV Pole Clamp and a Cable Box.
Cable Box (8210010) contains 3 cables:
– Camera Cable
– USB Cable
– Power Supply Cable
HARDWARE SET UP
Power Switch
Anesthesia
Bendini
Bender
Sterile Field Border
Sterile
2
System.
®
Non sterile
Fluoro
NVM5 CU
& Camera
Fluoro
Monitors